The flyover at Cay Go, district 11

The flyover at Cay Go round is considered the largest among the 12 steel flyovers in Vietnam. The bridge has a main direction on Hong Bang Street and a branch to the 3/2 street. The project has a total investment of over 450 billion dong.

This is the sixth steel flyover built in Ho Chi Minh City in more than a year. The overpass is built in Y-shaped, including the flyover branch from 3/2 Street to Hong Bang Street, 234m long and 7m wide, and the overpass straight to Hong Bang Street is 303m long and 12-15m wide. Construction and installation cost is about 314 billion dong.

Các dự án khác

Time Bridge over Diamond Island

Time Bridge over Diamond Island

  • Construction unit: DAT PHUONG JOINT STOCK COMPANY

View detail

Tunnel of An Suong intersection

Tunnel of An Suong intersection

  • Construction unit: updating
  • Construction time: updating
  • Total production of SMC concrete provided:  updating

View detail

Vo Van Kiet Boulevard (Old East-West Highway)

Vo Van Kiet Boulevard (Old East-West Highway)

  • Contractors : Obayashi - P.S Mitsubishi Joint Venture

View detail