The 500 billion VND project is expected to reduce the pressure on Dong Van Cong Street, convenient when going from District 2 to the city center..

The bridge over Diamond Island is nearly 300 m long, 22 m wide with 4 lanes, located in the section through Giong Ong To river. The starting point of the bridge connects the road along the Saigon River in a residential area of 30 hectares in Binh Khanh Ward. The end point connects the riverside toward Thanh My Loi ward.

Along with the bridge, the project also built embankments along the Saigon River, the Saigon River Road connecting the existing riverside road and the lighting system, trees ... The project has a total investment of nearly VND 500 billion. from city budget capital combined with contributions of businesses benefiting from the project.

Located in Binh Trung Tay Ward (District 2), Diamond Island is about 8 hectares surrounded by Saigon River and Giong Ong To. The island was organized by the People's Committee of Ho Chi Minh City to auction land use rights, Binh Thien An Joint Stock Company won and built the project in 2008..

Diamond Island Project has an investment of nearly VND 1,900 billion, including 6 apartment blocks of 16-25 floors, total construction floor area of over 122,000 m2, with 313 apartments and part of the area used as hotels and merchants. trade is located in the center of the island.

Currently, the first phase of the project has handed over and put into use 250 luxury apartments with the name The Brilliant tower. Residents are mostly middle-class, well-off and foreigners.

Các dự án khác

Vo Van Kiet Boulevard (Old East-West Highway)

Vo Van Kiet Boulevard (Old East-West Highway)

  • Contractors : Obayashi - P.S Mitsubishi Joint Venture

View detail

Tunnel of An Suong intersection

Tunnel of An Suong intersection

  • Construction unit: updating
  • Construction time: updating
  • Total production of SMC concrete provided:  updating

View detail