The flyover at Cay Go, district 11
The flyover at Cay Go round is considered the largest among the 12 steel flyovers in Vietnam. The bridge has a main direction on Hong Bang Street and a branch to the 3/2 street. The project has a total investment of over 450 billion dong.
This is the sixth steel flyover built in Ho Chi Minh City in more than a year. The overpass is built in Y-shaped, including the flyover branch from 3/2 Street to Hong Bang Street, 234m long and 7m wide, and the overpass straight to Hong Bang Street is 303m long and 12-15m wide. Construction and installation cost is about 314 billion dong.
Các dự án khác
Vo Van Kiet Boulevard (Old East-West Highway)
- Contractors : Obayashi - P.S Mitsubishi Joint Venture
Tunnel of An Suong intersection
- Construction unit: updating
- Construction time: updating
- Total production of SMC concrete provided: updating